Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!
Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.
Juanprado, it bolts on from the inside.
The way it looks, the factory bolts in the doghouse, then glues the insulated plastic cover to that.
Then they put the floormats on top of that.
I took a razor knife and carefully slit my floormat so it could be pulled out of the way.
The bolts on the top...
Hi ke5, are you talking about custom made hydraulic type hoses with swaged ends, or just fuel hose and clamps?
You could do hydraulic hoses I would guess, but I would think the cost would be prohibitive compared to the steel line.
Being on the high pressure side of the pump, I would not recomend...
Two of each is correct.
On mine it took longer to remove the shifter tower and doghouse than it did to do the mod.
The insulated plastic cover on mine was glued to the doghouse and covered the bolt heads.
1/8" male-male nipple into the head, 90 deg 1/8 pipe female-female onto the nipple, female inverse flare x 1/8 male into that.
Same setup front and rear.
Bend the 40" tube carefully, needs to hug the block pretty close, it's just long enough if bent correctly.
Have fun!
IsaLandr, on mine a 40" was perfect for the rear.
20" is too short for the front, I used a 30" cut down to about 26" and re-did the double flare.
As far as why replace the front, my guess would be to match line and fitting sizes, I believe the stock line was 5/16.
Clover compound is a brand of...
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website like our supporting vendors. Their ads help keep Steel Soldiers going. Please consider disabling your ad blockers for the site. Thanks!