Today samples of canvas came and so did the ballistic nylon. I was not impressed with the canvas 10oz samples but it gave me some materials to plan the front folds with the steel overhang and screw locations. Enough for 2 layers of 12 oz cotton canvas is on it's way, thus I will have 2 inner layers canvas + one outer layer ballistic nylon + insulation. Only the 18oz seemed worthy of using without the outer BN.
Tomorrow I'll get the "duck bill" 14 ga metal strip 2x2 with 30* bend and a 3/4" strip to sandwich all the material. Was planning rivets but stainless small bolts are sounding better. My fold will result in doubled BN + 2 layers of canvas folded over....so about 1/4" thick of canvas and nylon to sandwich and hold on the bottom of the duck bill . I'm leaving enough nylon to be doubled back (10") under the outer layer for reinforcement.
This thing should stretch very tight and have plenty of padding on the leading edge. I will round the steel edge and may put other protection on the edge that (4) layers wrap around.
I may be able to similarly anchor the back with steel strips to pull against, to make it tight.
Tomorrow I'll get the "duck bill" 14 ga metal strip 2x2 with 30* bend and a 3/4" strip to sandwich all the material. Was planning rivets but stainless small bolts are sounding better. My fold will result in doubled BN + 2 layers of canvas folded over....so about 1/4" thick of canvas and nylon to sandwich and hold on the bottom of the duck bill . I'm leaving enough nylon to be doubled back (10") under the outer layer for reinforcement.
This thing should stretch very tight and have plenty of padding on the leading edge. I will round the steel edge and may put other protection on the edge that (4) layers wrap around.
I may be able to similarly anchor the back with steel strips to pull against, to make it tight.
Last edited: