A few updates on the project!
The 803 was sold to a customer, and an 802 has taken its place. This works out well, because after talking with a few people, I'm going the EG4 Chargeverter route. This will allow me to run the generator at near 100% capacity when charging, which is a very good thing.
10kWh of batteries have been installed and running for a few months, another 20kWh of batteries are due to arrive any day now. 30kWh should keep the house plenty happy through nights and rainy days.
I finally had time to do some much needed "landscaping" around the house. The 802 was dropped on its pad last night, complete with vibration isolators (which will be bolted to the frame later-- I don't think they're going anywhere. Today, after work, I added on the 24v solar battery tender. I may swap it out for 1 5/8" strut instead of the 7/8" for a little more rigidity, but I had a stick on the work wagon to use.
Kurt's remote start has been installed and working perfectly! Nice to be able to see and do things from my phone.
Next up is trenching my electrical and comm wire, and giving the charger a test run.
If anyone is interested in the rubber isolators I used, they can be had on Ebay via Zoro for $5 a piece.
https://www.ebay.com/itm/335681195191