• Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!

  • Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.

 

Search results

  1. S

    MEP-004a single phase rewire and SX460 conversion.

    I finally found out about hooking up the field flash, I found some wiring diagrams that showed a diode inline on the field flash wiring. I have found why the original regulator went though, after frying a regulator I went through all of my wiring and found that my field coil is only 2.5 ohms...
  2. S

    MEP-004a single phase rewire and SX460 conversion.

    Well the instructions(found here: http://www.dieselgeneratorsmiami.com/recursos_tecnicos/NEWAGE-SX460-AUTOMATIC-VOLTAGE-REGULATOR.PDF) Make mention of disconnecting the field wires but I don't know if it's to save the regulator, or just to free up the wires to use a current limiting resistor and...
  3. S

    MEP-004a single phase rewire and SX460 conversion.

    Had a friend drop off his 004 for me to diag and fix, he had it at a generator shop for 6 months and all they did was unplug and remove the special relay box. I removed the regulator/exciter and found T2 completely fried and the inside of the box charred from the internal fire. After failed...
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website like our supporting vendors. Their ads help keep Steel Soldiers going. Please consider disabling your ad blockers for the site. Thanks!

I've Disabled AdBlock
No Thanks