Page 3 of 3 FirstFirst 1 2 3
Results 21 to 22 of 22

Thread: Operation Urgent Restoration II The M715

  1. #21
    4 Star General m38inmaine's Avatar
    Join Date
    Nov 2006
    Location
    Maine USA
    Posts
    2,070
    Thanks
    658
    Thanked 704 Times in 435 Posts

    Default

    I have 6 solar panels, a 24 battery 24v battery bank, 3600 watt inverter/charger and 8Kw Isuzu diesel generator that auto starts/stops when needed, purchased a "service truck" air compressor that is engine driven, that took care of my high demand air needs. Propane appliances, direct vent oil boiler for heat/hot water all has been working well for many years.

    Look forward to seeing the M715 project pictures.
    SSG USA(RET)
    85-05
    12B Combat Engineer

  2. #22
    4 Star General Jericho's Avatar
    Join Date
    Mar 2012
    Location
    Landaff NH
    Posts
    1,078
    Thanks
    65
    Thanked 513 Times in 317 Posts

    Default

    almost the same here, 6 340 watt panels, 7kw air rotor, two main gensets, John deere 33 kw turbo diesel tier 4 4 cylinder and a Mitsibishi tier 3 4 cylinder 24 Kw non turbo on an A/B circuit 3300 amp hours in L-16 trojan deep cycle 6 volt batteries and twin paired Trace 3600 watt 24/36 inverters have 24 years on the inverters, Just replaced the battery bank , had 8 years on it . Usually get 8 to 10 years from a bank . Mitsu has 110 thousand hours on it all ive changed is a water pump and altenator volltage regulator, John Deere is a nice unit but parts are expensive Fuel control solenoid went at 820 hours costing 850$ Been off grid since 1998, septic, artesian well and my own 3 mile phone line lol Not a prepper, power company wanted 188 thousand dollars to run power in !

Page 3 of 3 FirstFirst 1 2 3

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •