coachgeo
Well-known member
- 5,158
- 3,482
- 113
- Location
- North of Cincy OH
maybe it is lift and draw bridge? as in overhead winch lifts it to clear any deck upper pins from the track...Put a piece of ?? to push top of deck away slightly from track to keep top pins on each side from going back into track while lowering (tilts it outward at top a bit) .... then begin lowering via above winch causing bottom of deck's pins to re-seat home into a pivot point in both tracks. This would be followed by top of deck starting to swing/lower down to flat deck.I think I would rather have the drawbridge. Unless there is some lift mechanism we cant see this looks like it will take at least 2 people to raise and lower…
now if that is not how it works.... sounds like a clever way to build one though lol