• Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!

  • Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.

Search results

  1. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Thanks. Now to see when Stan gets home from work or out of his shop. Jerry :beer::beer:
  2. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Stan, Have never tried to link to another post on SS, but here goes: http://www.steelsoldiers.com/showthread.php?98817-Mep-002a-Auxiliary-Pump-Lift&p=1264825&highlight=#post1264825 Hope it works. Merry Christmas to you and yours. Jerry
  3. storeman

    My new Faraday cage/shed with insulation...a work in progress

    No grounding. All components of the shed have positive contact between them. Jerry
  4. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Greg, Casters are a must whatever your storage/housing arrangement. You need to be able to access the entire unit regardless of light conditions. Jerry
  5. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Greg, You got it right. One step at a time. Jerry
  6. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Cool to build. Besides, I needed another shed. Might as well use materials already on hand and get some additional benefits from it. I'm not quaking in my Army boots but am prepared. Jerry
  7. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Perhaps Patracy. But both units have physical disconnects at the house panel and in the shed. There is a house power quad outlet box and 2 fluorescent fixtures in there on house power but I think, at the worst, they would just be burned up rather than affect the generators since they are not...
  8. storeman

    My new Faraday cage/shed with insulation...a work in progress

    No the sets do not run at the same time. One is back-up to the other. The one on the left is isolated by a removable spade witch. If I were to run it, the right hand one would be physically disconnected by removing the 50 amp plug from it's receptacle. It would be nice to have an isolator...
  9. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Tubing is 2" from Advance about $28 for each 5' length. 1 3/4" would have been better but I split the ends at the mep elbow and used SS hose clamps and aluminum tape to seal the exhaust. I I nee to bring one out of the shed, just pull the tubing through wall. Napa also carries it in 10'...
  10. storeman

    My new Faraday cage/shed with insulation...a work in progress

    BTW: will be eventually some pattern of brown to blend a bit better from the water view, as will the tanks. Jerry
  11. storeman

    My new Faraday cage/shed with insulation...a work in progress

    Some pics of the Faraday cage I'm working on. MKT roof from GL, structural aluminum frame. 5v galvanized siding. Alum foil covered 1 1/2 " Celotex insulation (foil both sides) was used for walls and ceiling both for emp and sound deadening. Materials, except for 5v were left from my...
Top