Ok, so I'm installing an Ouverson locker, I get to the re-assembly part, reading TM-9-2320-209-34-2-1 page 10-90...frame 22
It says...
5. line up center punch marks on carrier case assembly(7) and helical gear(1) and put them together....
6. put in eight bolts(
7. put on eight nuts (9), aline(nice spelling there!!) holes in nuts with holes in bolts (
8. Put on safety wire (10) thru eight nuts (9) and bolts (
Go to frame 23.....
hello, what torque? is there a value someone knows of ? Or is it, tighten to 1 grunt and back off to align holes?
thanks guys
It says...
5. line up center punch marks on carrier case assembly(7) and helical gear(1) and put them together....
6. put in eight bolts(

7. put on eight nuts (9), aline(nice spelling there!!) holes in nuts with holes in bolts (

8. Put on safety wire (10) thru eight nuts (9) and bolts (

Go to frame 23.....
hello, what torque? is there a value someone knows of ? Or is it, tighten to 1 grunt and back off to align holes?
thanks guys